Loading and Unloading Gantry Crane
Request a Quote
Application:
The Taixin loading and unloading gantry cranes are primarily designed for construction jobs such as highways, bridges, power plants and so on. They are used for performing general loading, unloading and lifting operations for materials and equipment.
Lifting Capacity | t | 40 | 60 | 80 | 100 | ||||||
Span | m | 20 | 30 | 40 | 20 | 30 | 40 | 20 | 30 | 20 | 30 |
Lifting Height | m | 9 | 9 | 9 | 12 | ||||||
Working Classification Grade | A5 | ||||||||||
Main Lifting Speed | m/min | 1 | 0.95 | 0.8 | 0.8 | ||||||
Trolley Working Speed | m/min | 10 | 10 | 10 | 10.5 | ||||||
Cart Working Speed | m/min | 14 | 15 | 15 | 13 | ||||||
Total Power | kw | 22.8 26 | 30 | 31.4 | 46.4 | ||||||
Recommended Steel Track | 43kg/m |
- The loading and unloading gantry crane adopts trusswork structure and has a small dead load and wheel pressure, delivering reliable performance.
- The loading and unloading gantry crane is mainly formed by splicing steel, its structure is generally divided into single main girder type and double main girder type, hoisting mechanism is generally winch, according to its work characteristics that lifting and running speed is slow, the cost is also low, so it is more suitable for usage on construction sites.
- Engineering loading and unloading gantry cranes generally have large door leg widths and high working speeds, which can improve work operating efficiency. In particular, when lifting some of the larger and heavier cargoes, we generally use double-girder engineering loading and unloading gantry cranes.
Index
heavy duty lifting crane, industrial crane, bridge construction
Related products
Send Message
Most Recent
More
Other Products
Videos